A wallbox stand proves its value when it leaves the rendering and reaches the job site. This documented case follows the VoltaCover Stand from site preparation to final fixing.

1. Preparing the base
The documentation shows the excavation, subsequent filling and positioning of the plate that will receive the Stand.
2. Positioning and fixing the plate
After positioning, the plate is secured and transverse and longitudinal levels are checked.
3. Positioning the Stand
The Stand is then placed on the plate and fixed. At this stage, the structure becomes a freestanding charging point ready to be completed according to the electrical project.
4. Finishing
The documented case includes grey silicone sealing and touch-up painting.
Why we show a real installation
Because VoltaCover Stand should not be evaluated as a simple wallbox post. The base, cable routes and internal structure are part of the solution and need to be considered together with the installation context.
See how the VoltaCover Stand is built →
See sizes, finishes and availability →
Foundation, anchoring and electrical connections must be defined and carried out by qualified professionals according to the site and electrical project.